How to Install an Above Ground Pool in 10 Steps

We have installed over 5,000 above land pools over the years and we normally hear a few clients ask if they could do it themselves. The unretentive answer to that is yes .
But, you do need the right equipement and the right instructions .
The manufacturers of the above grounds like Aqualeader and Zodiac do a great job at manufacturing them. But it would be a elongate to say that every model comes with instructions on how to assemble ( not quite like Ikea furnature ) .
Our goal here is to give you a 10-step overview on how to install an above ground consortium yourself.

immediately before you get started on reading the steps, know that this is one of the ways to instal. Every builder adds their own style .

 

Step 1: Find Space for your Pool and Start Clearing

Your first base step is decide where you want to install your swimming pool. We highly advise you do this first exercise before chosing your pool size. Insert a steel rod where you want the center of your pool to be. By taking the pool size and separate by two, you can use use a measure tape from the center perch and make a encircle. Take a rope or an extension cable and lay it down to visually see where the pond will end up .
above-ground-pool-base
Make indisputable there are no obstructions in that area. besides determine where your pool equipement will be. It is recommended that your equipement stays within 4 feet of the wall ( do confirm the distance requirements based on your local regulation and by-laws ). This puts less press on your pump. We have many clients that request to have the equipement set much further away. Just remember that aboveground pool pumps are gravity fed.   This means it must be lower than the trap where the skim water output is.
once you know and you have marked where the pool and the equipement will be, it ‘s clock to get your hands cheating .
If you are on grass, then use a sod cutter ( one can be rented for the day for under $ 100 ). Remove the sodomite in all the areas your identified where the pool will go. Start with cutting 1 extra animal foot around the pool. Do the whole set around to start, and then make lines across the center, and remove everything inside .
Pro Tip: If you cut the sod in long streeks, you can roll them up and use them late around the pool area to create a legato natural elevation around the areas you had to dig .
once the sodomite is removed, with the assistant of a theodolite level, you start start making sure that major areas are level within 1 column inch .
There are 2 schools of remember. One says your should build up the lower areas with supernumerary scandal. Others say you should dig down. If you find yourself on a identical unlevel surface, then I would turn to professionals since you could run into some drain or wash-out issues. But if your backyard is reletively flat, then we have found it best practice to dig down the areas. The logic is because we want the pool to be stable. You will want your pool base to sit on the area that has had at least one class to settle in, as opposed to loose dirt that was compacted .
so if you do like us, start dig and bring the soil to a corner or the house .

Step 2: Build Stone Dust Base

once you have a clean surface that is largely charge, you can start to bring in stone debris.
Lay down at least 2 inches of the stone approximately where the pool wall will sit. Be sure to read the specification of your pool make and model, since every manufacturer has slight differences .
Pro Tip: If you wanted to build up your pool, you can increase the thinkness of the stone scatter in the lower areas. But do n’t go over 8 inches .
The Circle should be at least 1 foot across-the-board, with the demand circomference of the pool being in the center field .
Level the base using compactor for Swimming Pool
Your foremost attack of level should be within 1/4 inch ( yes, we placid use the imperial system ). We have this tool we use on the crowd at Campbell Pools which allows us to set it down on the al-qaeda and with the transit, we look at the measurements on the joyride. You can do the like with a ruler, but it will be pretty low .
Using a pitch, make certain your level everything around the floor, ensuring that the area where the wall will sit is the most accurate .
When you are within 1/4 column inch all about, bring in the compact. Do use a garden hose to lightly spray the stone dust to prevent dust and to improve the effects of compact .
But it does n’t stop there, that was round one .
now that everything is compacted, you need to measure again. Go around the pool and this time, bring everything within 1/8 edge ( or 3.175mm for metric ). and you measure absolutely every area where the wall will sit. This will ensure your pool will be level and stable .
bill : many successful installations do not use this level of preciseness. In our lawsuit, we have a identical high standard for installations .
once you have added or removed the stone to make everything sol accurate, use the compactor one more clock. once your done, leave the compactor inside the consortium, you will need it later .
how to install an above ground pool - building the base

Step 3: Lay Down Bottom Track and Pin to Pool Specifications

It ‘s now clock to start building the pool structure. You will have pieces called the bottomland lead where the wall will sit at heart, and connectors that join the track and posts sit. Following the specifications of the pool make and model, bring the groove inside those connectors to EXACTLY the half measurement of the pool size. ( e.g. if your 24 ‘ pool is actually 24 ‘ 1 ”, you need to measure 12 ‘ 1/2 ” to be the measurement where the groove for the wall to fit EXACTLY )
Install Bottom Track Above Ground Pool
This is critical to make indisputable when you unroll the wall, you do n’t find yourself having to re-roll it. You will find out how heavy that wall can be soon enough .
once the placement of that connection is set, use a long collar or a pin to lock it in station. You do this for every one one. measure doubly if necessairy .
Pro Tip: We have steel rods we set with ankors to the wall. We put these rods in the in-between of the bed tracks, on the outside. These ankors will lock into the pool wall during the construct to pervent it from falling ( or more presisely, kinking the wall ). A crimp wall, is a useless wall .
Installing the Bottom Track for Above Ground Pool

Step 4: Bring in Sand for Base

Our bases are built of backbone. You will need to wheelborrow in the sandpaper inside the pool. If you are going to a quarry, the best we have seen is screened backbone, flimsy mix of clay. This allows the sandpaper to compact firm. Do not use the popular mortar backbone, which is much used for bricklaying.
how to install an above ground pool - adding sand
Note: You can start bringing in the backbone before the previous mistreat. Just make sure that you lay down a piece of plywood or cardboard to protect your border. When you are done bringing in sand, make certain to re-level and inspect the sphere to walked over the stone dust to ensure it ‘s leveled .
We normally bring in 4 inches of backbone inside for the base. You will find yourself approximately spreading it inside the naiant pool. But do not bring it against the pit twilight r-2 yet. You will need to have the wall installed before you do that. so merely add excess sandpaper near the edges inside so that you will be able to level it late .
During pool installations with our crew, we normally have a few steps happening at the lapp prison term .

step 5 : install Strucuture Part 1

nowadays comes fourth dimension to unroll the wall. Before doing so, be certain to identify the connection you will want to use as the sphere where you will bolt the wall together. Your skimmer and return will end up near that sphere ( normally at the conclusion of the roll ) .
Get some friends for this to help. Many of them. You will need to unroll the wall from the at heart without damaging the base .
Pro Tip:   We have a steel rod that we place following to the starting steer of the wall and we tie the wall to that rod thus that it stays in locate. We besides have a balmy with a smooth open under it that rotates. It makes the process sol much better .
Unrolling the Above Ground Pool Wall

Read more : Smoked Pork Shoulder

lento move the wall and unwind as you walk around the pool. Once person will need to lay it securely inside the groove. once you have completed the circle around the pool, you will be able to bolt the wall together. You should immediately start to see how your pool sol going to look like in your backyard !
Above Ground Pool Installation of Wall
once the wall is secured, you can start installing the posts on top of all the connectors. Do n’t forget to remove the pins you set earlier. If you have a beaded liner, you will besides be able to install the bead chase. Adding this track will create much more stability to your wall. Make indisputable that those tracks are installed hard and there is no gap between each you lay down. note that very much, you will need to cut the final piece to make it fit. Make sure you measure twice, cut once .

Step 6: Complete the Base

Remember we told you to add supernumerary sand and to keep the compactor inside ? immediately it ‘s time to setup the base of the pool. You can start by pushing the sandpaper against the wall thus that it covers all the gem dust. Add extra sand here to create a transition between the upright wall and the ground ( see picture below ). Level all the backbone and make sure there is enough everywhere. Some people like to do a spoon of the consortium, making the focus on profoundly then the sides. note that this can be done, but you need to ensure that you do n’t over do it. Your liner can merely strech then a lot. Do n’t go over 4 inches of smooch .
Onces you have done a good job at raking the surface inside into a politic human body, you can use that compactor to firm up the surface .
pool-base-install
note : Make sure that you did a great job raking the surface. Once that sand is compacted, that will be the root of your pool. You will feel irregularities .
depart from the wall with the compactor and make cicles all the way inside. then make more circles all the way back to the wall. You will need your friends again here to lift the compactor over the wall .
How to Install the base of swimming pool
At this point, you will need to smooth out the surface inside using a cement trowel. Take off your shoes to prevent damaging your surface. Your surface should look perfect by the time you are done .

Step 7: Roll out and Install Liner

time to unroll the liner inside the pool. The whoremaster here is to lay it at the center of the pool and unfurl from there .
pool liner installation aboveground
pro tiptoe : If it ‘s a cheery hot day, which is the best day to install, open the liner box and open it slightly so that your liner gets hot. This will make it stretchy and it will be easier to install .
This is best done with 2 people inside the pool. Bring it over to the walls and clip it inside the bead track. Your friends outside should help with clipping it all around .
Pool Liner Aboveground Install
Onces it ‘s clipped everywhere, using your feet, try on to spread the bottom to flatten and get closer to the wall .
You should start bringing in water system now. Pour in about 2 feet of body of water and stretch the lining to remove any creases as it is filling. If you do n’t remove it now, it will stay everlastingly .
Pro Tip: Get a water system truck rescue. The Garden hosiery will take lots of time to get to that first 2 feet, which is necessity to completing the facility .

Step 8: Install Strucuture Part 2

It ‘s now time to finish the structure. Start by leveling all the posts that you installed earlier. The pieces of the clear hood and posts are different for every pool, thus make certain to consult with the “ instructions ” provided in the corner .
install-posts
Yours posts should somehow be lightly secured to the wall. It ‘s now time to install the top rails. One you have installed at least 3 top rails, your friends inside the pool should be able to jump out from that area, assisted by the friends outside .
polish installing all the top rails and add the top hood angstrom well. Your pool should be looking truly courteous at this point. You are done with the major social organization now .

Step 9: Install Plumbing Equipement

At the area you specifed at the originate for your equipement, remove the turf and add the excess stone dust. level it. We use patio stones, two of them, side by side, to install the equipment. Level the patio stones .
We wo n’t go into details on the plumning since all equipement is different. What is crucial here is the skimmer and the return .
how to install an above ground pool plumbing
For the come back, take the piece that goes inside and align it to go inside the Return trap. Looking from the inside, you should be able to press the piece through, giving your a clear area you can make a adam cut through the liner. Install the render hard .
For the skimmer, bring the inside faceplate to align with the holes from the rampart. Using the screw, beginning piercing through to attach to the soundbox of the skimmer. once all screws are secured, you can cut the inside of the boater liner and open it .
warn : Do not drop any screws. ever. This will pierce your stigmatize newfangled liner. And if you are using a exercise, make certain you do n’t slip and “ punch ” the liner. For obvious reasons .
The rest is attaching the pipes to the equiment. If you are not sure about the order of equiment, just call any of our stores, we will help you .

Step 10: Fill with Water and Find your Bravest Friend

Install Above Ground Pool

You cannow go ahead and fill the pool. You will need to give it a chlorine shock as it most likely be very green. Make sure the pump is running so that it circulates the water .
But first base, you need to find your bravest acquaintance. That could be you or tied possibly your kids. But that person can claim the entitle of being the bravest by jumping into the pool as the beginning ever ! If you took your water from a prey, that water will be freezing cold. therefore claim that claim and let that be the first of many swims .
note : Do n’t worry, you will see the temperature climb fast in the summer. You can constantly add a fastball .

And that’s  how to install an above grate pool yourself

congratulation ! You have completed your swimming pool facility. This is no slowly tax, but we give you our deference for doing sol. If you did use our tips to install your own pool, we would like to know ! send us a electronic mail with pictures at information @ campbellpools.ca. possibly we will even have function for you ; ) .
If you are hush looking to buy a pool to install yourself, do get a quote from us. You merely need to add in the notes that you want a to install yourself. You can request a quote by clicking under .
We hope this post has helped you. If you need clarifications or help during your install, you can always call our stores for advice .
We would like to recognise Pierre Menard for providing the pictures in this post. Him and his crowd have been installing pools with Campbell Pools for over 20 years. I have learned everything from him as my mentor to write this post.